NASA confirms 2028 landing after orbital shift
SpaceX requested a move to high-Earth orbit to reduce energy demands, altering the docking protocol for the Artemis program.
By Benjamin Rousseau ·

NASA confirmed on Friday that a crewed lunar landing remains targeted for 2028, following a revision to the mission architecture that moves the initial docking phase to high-Earth orbit. The agency detailed this change during a news conference, marking the first public acknowledgment that the underlying plan has shifted from previous descriptions. Under the new protocol, the Orion spacecraft will join the SpaceX Starship in orbit around Earth before the combined vehicle travels to the Moon.
The adjustment addresses specific engineering requests from SpaceX. In meetings held in early 2026, SpaceX engineers asked NASA to remove the requirement for Starship to dock with Orion in a near-rectilinear halo orbit around the Moon. That specific orbital path required additional energy and introduced technical difficulties. The cancellation of the Lunar Gateway project earlier this year removed the infrastructure that necessitated that complex maneuver, allowing NASA to adopt the simpler Earth-orbit docking sequence.
Blue Origin’s approach to the Artemis program differs from SpaceX’s. The company plans to use four launches of its New Glenn rocket, with no requirement for in-space refueling. Blue Origin’s architecture leaves open the possibility that its Blue Moon lander will meet Orion in low-lunar orbit, rather than in Earth orbit.
NASA officials stated that the Artemis III mission is still expected to fly in the summer of 2027. This demonstration flight will see Orion dock near Earth with both the Blue Moon and Starship vehicles. The Artemis IV mission, which will include the actual surface landing, remains on schedule for 2028.
NASA Administrator Jared Isaacman expressed confidence in the revised timeline during the briefing. "This is an achievable path we are on right now," Isaacman said. "We have the mandate, we have the resources, and the support from our stakeholders to be able to execute, and that's what we intend to do."
The agency stated that leadership has reviewed every element of the Artemis program to help lunar lander partners speed up their work. While the schedule remains firm, the success of the 2028 target depends on NASA and its partners executing the revised technical plans on time.
Friday’s presentation provided the most detailed public account of the lunar landing strategy to date. While much of the underlying information had been reported previously, the agency openly described the full approach and the specific changes made to accommodate the different capabilities of its commercial partners.
Source: Ars Technica
More Business · Tech news · Watch Your Wallet · Report a business · Got a Story?





